Placement of concrete beams onto bridge abutments - Where?
The image is from a photograph collection that was originally stored at Kincardine Forest District office at Durris and may have been taken by Sandy Sandilands.
There is no information with these images and the date of 1982 is an estimate. The concrete beams are almost certainly pre-stressed reinforced beams manufactured at specialist facilities and often used for longer single span bridge crossings by the Forestry Commission.
Please see the PDF below which has other views of the operation to crane on the beams and of the transport lorries that brought the beams to the location. Note that at least two long reach cranes are being used one of which has the name Baldwins on the jib. The lorry bogie attached to the far end of the beams is steered by a very exposed operator.
Can anyone identify the location and the forest name?
Download Large Version (625kB)
Groups: Forestry in Action, Mystery and unknown, Road and Bridge Engineers and Works
Group: Forestry Areas - 3222 pictures
2 Comments
As to whether it is Council or FC operation I do not see any supporting vehicles to judge. I assume if it was a Council job then contractors would carry out the whole job. There is only one Transit van seen, rear view with doors open, and no distinguishing decals visible. A few yellow safety hats as well as white ones?
Norman Comment left on 12 December 2021 at 08:05 by Norman Davidson (Website Curator)
Presumably this would be Norhumberland council work, but I am not sure if the FC were responsible for the roads in and around Kielder village at the time?
Comment left on 08 December 2021 at 09:04 by Iain Gale